HUAYING
Reservoir Dam Safety Monitoring
Hydroelectric and Water ConservancyCustomer:Water Resources Bureau of [City Name]

Reservoir Dam Safety Monitoring

Project Background

The city manages 10 large reservoir dams requiring regular safety inspections and deformation monitoring. Traditional manual inspection is inefficient, high-risk, and leaves blind spots.

Solutions

Adopt a drone-based aerial survey and 3D modeling approach to analyze dam deformation. AI automatically identifies hazards such as cracks, seepage, and landslides, then generates inspection reports.

Use Device

Autel EVO II Pro × 3, 3D Modeling Software × 2, AI Analysis System × 1

Implementation Results

Annual inspections conducted 48 times, hazards identified and resolved: 15, ensuring flood safety for 10 reservoirs. Inspection efficiency improved by 4x, costs reduced by 70%.

Customer Reviews

"Drone inspections enable comprehensive monitoring of dam safety, allowing us to identify and address hazards promptly to protect people's lives and property."

Have a similar project need?

Get in touch now
Beijing ICP Filing No. 2026026760-1